Case studies

Problems we have already solved

Our own installs, plus documented projects from every line we carry — with the numbers, the people who ran them, and a link to each source.

Barnes SITHE chopper pump on site at a Fayetteville lift station
Sithe cutter success profile

A lift station that clogged twice a week — for years.

The City of Fayetteville, North Carolina struggled with a lift station that clogged for years. After trying pumps from other suppliers, they still had to unclog this station twice a week. Heritage Water and Barnes Pump worked with them to install two Sithe chopper pumps.

10 monthsIn service at time of report
ZeroClogs since installation
2Sithe chopper pumps
Complete lift station retrofit
Complete lift station retrofit

Wipes, constant failures, and only single-phase power available.

When an apartment complex found themselves in a bind, Heritage Water was able to pull together the parties required to find a solution. The complex had been experiencing constant clogging and failures as residents disposed of more wipes into the waste stream. We provided a bypass pumping system, refurbished an outdated piping system, and supplied new controls allowing three-phase power when only single-phase was available from the power company.

BypassPumping kept flow moving
RebuiltPiping and controls
FastStation back up quickly
In our territory

Documented projects in the Carolinas and Virginia

Fayetteville, North Carolina

Chopper pumps end a chronic clogging station

Fayetteville PWC ran a duplex station that clogged at least twice a week on wipes and hygiene products. Impellers were lasting under a year and crews were being called out at night. Two 4″ 5 HP Barnes Sithe chopper pumps went in during January 2019.

ZeroClogs since install
4 moreSithe pumps since ordered

“have reduced overtime and callouts tremendously”Mike Wright, Senior Project Coordinator, Fayetteville PWC

Heritage Water Systems, Inc. is named as the distributor on this project.

Barnes · Crane Pumps · Crane Pumps case study

Hilton Head Island, South Carolina

130 lift stations onto one monitoring platform

Hilton Head PSD ran 130 lift stations across a patchwork of SCADA systems — some with none at all, needing daily visits. Cellular RTUs were fitted into the existing control panels. Fifty sites went in over two weeks; the district’s own electricians finished the rest after training.

19,000Customers served
2 weeksFor the first 50 sites

“STREAMETRIC has brought the ability for me to have what I need at a hundredth of the cost.”Dave Disney, Project Engineer, Hilton Head PSD

Streametric · Streametric case study

Eden, North Carolina

Sixty horsepower of aeration taken off the bill

The Mebane Bridge plant was running 240 hp of aeration to hold solids in the north basin, pushing dissolved oxygen to 6–7 mg/L — far past what the process needed. A single SB10000 circulator let them cut back.

60 hpSaved on the first basin
25%Aeration reduction

Published 2010, under the earlier SolarBee/Medora ownership.

SolarBee · IXOM Watercare · Water & Wastes Digest

Roanoke, Virginia

Lift station monitoring across five jurisdictions

Western Virginia Water Authority serves more than 60,000 wastewater customers across Roanoke, Franklin, Botetourt, Boones Mill and Vinton. The engagement covers lift station monitoring, virtual flow prediction without physical meters, and pump efficiency tracking.

60,000+Wastewater customers
5Jurisdictions

Project description; no published results yet.

Streametric · Streametric

Elsewhere

What these lines have done for other utilities

Outside our territory, but the same equipment solving the same problems — useful when you are weighing an option.

Yuba City, CA

Odour gone in the first hour, grease pump-outs down 95%

A 1950s structure converted to a lift station moving 2–3 MGD. Charcoal filtration was overwhelmed and crews were hydro-vaccing about 1,000 gallons of grease a week. Two Twister heads and a 40 g/hr ozone generator were piloted, then installed permanently.

95%Fewer FOG pump-outs
~1 yrProjected payback

“The odor was gone. Pump-outs for FOG matter have been reduced 95%, and ragged-up pumps have been eliminated.”Tim Bybee, Wastewater Collection Supervisor, Yuba City

Titus Twister · Titus case study

Ukiah, CA

Half a million a year in pump rebuilds, stopped

A 2.8 MGD plant peaking at 20 MGD in wet weather. Debris meant either manual removal down a wet well or replacing pumps — five were failing roughly every year at about $100,000 each to rebuild. A Screentec vertical bar screen went in ahead of them.

$500k+Saved per year
ZeroPump rebuilds since

“Once the Aqualitec bar screen was installed, we haven’t had to rebuild any of the pumps.”Alan Hodge, Plant Supervisor, City of Ukiah

Aqualitec · Water Online

Flowery Branch, GA

Phone lines cut, monitoring improved

Growth was outpacing the Verbatim units on traditional landlines, and running new phone lines to remote sites had stopped making financial sense. AlarmAgent went into the existing panels without modification.

$9,000+Saved yearly on phone lines
$37Per station monthly, vs $115

“We count on AlarmAgent to tell us what is going on with the stations.”Jimmy Dean, Water/Wastewater Director, Flowery Branch

RACO AlarmAgent · RACO case study

Sun City, AZ

A 1970s screen replaced, and the pumps downstream with it

EPCOR Water had a 2-inch coarse screen passing nearly everything, and cleaning it meant two workers climbing a 30-foot shaft. Debris was jamming pumps and mixers miles downstream. A half-inch Screentec now removes the bulk of it at the station.

75%Of non-dispersibles removed
HalfThe pump size now needed

“Cleaning the lift station screen was very awkward and unsafe.”Douglas Griffith, Operations Manager, EPCOR Water

Published as sponsored content by the manufacturer.

Aqualitec · CWEA — sponsored content

Westfield, IN

Forty hours a week of overtime, recovered

Citizens Energy Group had a duplex lift station on Tomlinson Road clogging several times a week on wipes, absorbing up to 40 hours of overtime weekly. Two 60 hp Barnes solids-handling vortex pumps and a new rail system replaced it.

40 hrsWeekly overtime before
260 hp vortex pumps

Barnes · Crane Pumps · Water & Wastes Digest

South Jordan, UT

Four pumps that stopped ragging

Four 125 HP pumps at the Jordan Basin reclamation facility were ragging at least weekly, with audible cavitation and five to six person-hours a week spent de-ragging — work that exposed staff to raw sewage and sharps. Four DERAGGER systems went in.

312 hrsSaved per year
$9,000+Saved in year one

Industrial Flow Solutions · IFS case study

These projects were published by the equipment manufacturers and by trade press, not by Heritage Water Systems, Inc. Quotes belong to the people who gave them. We link to every source so you can read the original.

From the field

Installations across the Carolinas and Virginia

Field installation
Dry pit pump installation
Sewage treatment plant installation

Have a station that keeps failing?

We have almost certainly seen it before. Tell us what it is doing.